Quantum QR1201-B5-S1D32 Guía de usuario Pagina 51

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 142
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 50
Chapter 3 Operation
Creating a Protection Plan
GoVault™ Data Protection Software, Version 1.0 User’s Guide 37
Figure 27 Advanced Schedule
Options Dialog
6 As required, use the option buttons and selection boxes on the
Advanced Schedule Options dialog to specify:
•Start Date
•End Date
Repeat Task:
Every 1 to 9,999 minutes or seconds
Until either a specified Time, or a specified Duration of from 1
to 9,999 hours or 1 to 99 minutes
•The
If the task is still running . . . option
7 Click
OK to close the Advanced Schedule Options dialog and return to
the Windows
Scheduled Task dialog.
8 Click the
Settings tab of the Scheduled Task dialog to specify the
advanced scheduling task options for your protection plan (see
figure 28
).
9 As required, use the check boxes and selection boxes on the
Selections tab to specify:
Selected Task Completed options:
Delete the task if it is not scheduled to run again
Stop the task if it runs for 1 to 999 hours, 1 to 99 minutes
Idle Time options:
Only start the task if the computer has been idle for at least 1-
999 minutes
Vista de pagina 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 141 142

Comentarios a estos manuales

Sin comentarios