
Appendix B Relocating the Library
Preparing the Library for Relocation
88 ATL P2000 Series Automated Tape Library User’s Guide
Figure 50 Installing
the Gripper Restraint
Screw
Load Port
Shipping Plate
2
The load port is located in the front door of the library.
a
Attach the cardboard and shipping plate to the load port.
b
Insert the bolts and washers that secure the plate to the load
port and secure them using the screws provided during the
unpacking procedure (see figure 51
).
Disconnecting
Library Cables
2
To disconnect library cables:
1
Disconnect SCSI cables and terminators.
2
Disconnect the power cord from the outlet and the power
distribution assembly of the library.
3
Pack all cables with other library accessories.
Comentarios a estos manuales