Quantum P2000 Guía de usuario Pagina 113

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 146
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 112
Appendix B Relocating the Library
Preparing the Library for Operation
ATL P2000 Series Automated Tape Library Users Guide 93
Preparing the Library for Operation
2
After shipping or moving the library, refer to the ATL P2000/
P3000/P6000 Pre-Installation Site Survey Instructions and the ATL
P3000 Series Unpacking Instructions to:
Prepare the new installation site
Receive the library
Uncrate the library (required in shipping the library)
Position the library
Prepare the library for operation
Vista de pagina 112
1 2 ... 108 109 110 111 112 113 114 115 116 117 118 ... 145 146

Comentarios a estos manuales

Sin comentarios