PX502 Tape Library Quick Start Guide
13
Multiple Library Stacks 0
If the library will be installed in a rack with other PX500
Series libraries, you must prepare each chassis prior to
installation. Preparing the library chassis for installation into
a multiple library stack consists of:
• Removing the FlexLink cover plates
• Installing the alignment hardware
To prepare the library chassis for multiple stack operation:
1 Remove two PHILLIPS screws securing each FlexLink
cover located on the top and bottom of the library
using a #1 PHILLIPS screwdriver (see figure 23
).
N
OTE: If the library is NOT being installed with other
libraries to operate in a multiple library stack, it is
not necessary to complete the following
instructions.
N
OTE: It is recommended to place the Master library in
the middle of the library stack for improved
performance.
NOTE: Remove the bottom FlexLink cover on every library
except the bottom library in the stack. Remove
the top FlexLink cover on the bottom library in the
stack.
Figure 23 Removing the FlexLink
Cover
2 The alignment hardware installed on the top and
bottom of the libraries in a multiple stack allow the
FlexLink bays to align correctly when installed in a rack.
Install the following alignment hardware (see
figure 24
):
a Install the top alignment hardware with two Allen
head screws.
b Install the bottom alignment hardware with one
Allen head screw.
N
OTE: Install only the bottom alignment hardware on
the top library in the stack and the top alignment
hardware on the bottom library in the stack.
Screws
FlexLink cover
Remove only the top
FlexLink cover on the
bottom library in the
stack
FlexLink cover
Screws
Remove only the
bottom FlexLink
cover on the top
library in the stack
T
o
p
B
o
t
t
o
m