Appendix B Relocating the Library
Preparing the Library for Operation
98 Quantum|ATL P3000 Series User’s Guide
Preparing the Library for Operation
2
After shipping or moving the library, refer to the ATL P2000/
P3000/P6000 Pre-Installation Site Survey Instructions and the ATL
P3000 Series Unpacking Instructions to:
Prepare the new installation site
Receive the library
Uncrate the library (required in shipping the library)
Position the library
Prepare the library for operation