
Chapter 2 Installation Procedures
Installing the Internal LTO-3 Half-Height Tape Drive
LTO-3 Half-Height Tape Drive User’s Guide 9
Installing the Internal LTO-3 Half-Height Tape Drive
To install the internal LTO-3 Half-Height Tape Drive, complete the
following procedures in the order presented:
1 Depending on the interface configuration of the drive:
2 C
onnecting the Internal Drive Interface and DC Power Cables on
page 15.
3 Restarting the Internal
Tape Drive System on page 17
4 Installing the LTO Driver Software
on page 25, if required.
5 Registering the LTO-3 Half-Height Tape Drive
on page 25.
IF the drive interface is . . . THEN . . .
parallel Small Computer
System Interface (SCSI),
proceed to Configuring the Internal
Parallel SCSI Tape Drive in the
following subsection to configure
the parallel SCSI ID and bus
terminator power.
serial-attached SCSI (SAS), there is no need to configure the
SCSI ID or bus termination, as SAS
is a point-to-point architecture. Skip
to Mounting the Internal Tape
Drive on page 13
Comentarios a estos manuales